Consulting in two areas: the treatment process, and the control systems that run it

Below is what each service involves, what you receive, and what we need from you to do it properly. Every engagement is scoped in writing first.

Process engineering

Water and wastewater treatment process

Potable, industrial process water, wastewater and reuse, with particular depth in membranes (RO, NF, UF, MBR) and complex water chemistry.

Process design and option studies

Selecting and sizing a treatment train for a defined feed water and product specification, from concept through to the process basis for detailed design. Option studies compare alternatives on treated-water quality, chemical and energy use, waste streams and operability.

You get

  • Process basis of design
  • Mass balance and process flow diagrams
  • Equipment sizing and chemical consumption
  • Options comparison with assumptions stated

We need from you

  • Feed water analysis (ideally several samples, covering seasonal range)
  • Product water specification or regulatory target
  • Site constraints: footprint, power, waste disposal routes

Process modelling and simulation

Modelling an existing or proposed plant to predict treated-water quality, scaling and fouling risk, chemical demand or the effect of a change in feed water. We use Pro-Seer (our own software, with PHREEQC chemistry) and calibrate to plant data where it exists.

You get

  • Calibrated model with inputs and assumptions documented
  • Scenario results checked against the relevant guideline (e.g. ADWG)
  • Model files, if you hold a Pro-Seer licence

We need from you

  • Water quality data
  • Plant configuration and operating data
  • The question the model has to answer

Membrane system troubleshooting and audits

Finding out why an RO, NF, UF or MBR system has lost flux, salt rejection or recovery, and what to do about it: fouling, scaling, biofouling, damage, pretreatment problems or instrumentation. Data is normalised first, so the trend reflects the membranes rather than temperature and feed changes.

You get

  • Normalised performance analysis
  • Root-cause assessment with supporting data
  • CIP, pretreatment and operating recommendations
  • Optional ongoing monitoring in MemTrack

We need from you

  • Operating logs (flows, pressures, conductivity, temperature) from before and after the problem started
  • CIP and membrane replacement history
  • Feed water analysis; membrane autopsy results if available

Commissioning support and optimisation

Process commissioning of new or modified plants, and optimisation of plants that work but cost too much or run close to their limits: chemical dosing, recoveries, backwash and CIP regimes, and control setpoints.

You get

  • Commissioning procedures and records
  • Performance test results against design
  • Optimised setpoints and dosing with the basis documented

We need from you

  • Design documentation and control philosophy
  • Site access and operator time
  • Historian or SCADA data access

Technical due diligence and design review

Independent review of a proposed or existing treatment design, or a vendor's offer, for an owner, financier or contractor. We check the process basis, sizing, guarantees and risks against the feed water and the operating reality.

You get

  • Review report with findings ranked by consequence
  • Clarification questions for the designer or vendor

We need from you

  • Design package or tender offer
  • Feed water data the design was based on

ICS / OT security

Industrial control system security

PLCs, HMIs, SCADA, historians, remote access and IIoT devices on water, food and beverage and other industrial sites. Work is carried out with the process in mind: nothing is tested in a way that could upset a running plant without the operator's agreement.

Frameworks: ISA/IEC 62443, NIST SP 800-82, the SOCI Act 2018 and its CIRMP rules. NERC CIP for clients with North American power assets.

Vulnerability assessment

Identifying known weaknesses in PLCs, HMIs, SCADA servers, network equipment and remote access paths, and ranking them by consequence to the process rather than by CVSS score alone. Passive methods are used on live control networks unless you agree otherwise.

You get

  • Asset and network inventory as found
  • Findings ranked by process consequence
  • Remediation plan that accounts for what can't be patched

We need from you

  • Network drawings and asset lists (whatever exists)
  • A site contact who knows the control system
  • Agreed scope and rules of engagement

Penetration testing (remote and on-site)

Controlled attempts to exploit the weaknesses that matter: remote access, IT/OT boundaries, engineering workstations and HMI/SCADA applications. Testing on production systems is planned with operations and, where possible, carried out on standby or test equipment first.

You get

  • Test plan and rules of engagement agreed before testing
  • Report of attack paths found, with evidence
  • Retest of fixed items

We need from you

  • Written authorisation from the asset owner
  • Operations sign-off on timing and stop conditions

PLC / HMI / SCADA and IIoT hardening

Fixing what assessments find: configuration changes, network segmentation, remote access controls, account and password management, logging and backups, without breaking the process. Includes staff training where it's needed for the changes to stick.

You get

  • Hardening changes implemented or specified
  • Updated configuration records and backups
  • Operator and maintainer briefing

We need from you

  • Change windows agreed with operations
  • Access to engineering software and project files

Threat hunting and incident response

Looking through control-system logs, network data and PLC logic for signs of compromise, and helping contain and recover from an incident. Pro-Cyber can be deployed to watch process values for spoofed or inconsistent data.

You get

  • Findings and evidence
  • Containment and recovery steps
  • Post-incident review

We need from you

  • Access to logs, network captures and PLC project files

Eldershine is a small practice, not a 24/7 security operations centre. Incident response is offered to existing clients on a best-efforts basis. If you need guaranteed response times, we can tell you who provides them.

SOCI Act compliance and CIRMP

For Australian critical infrastructure assets (including water) under the Security of Critical Infrastructure Act 2018: assessing your current position and building the Critical Infrastructure Risk Management Program (CIRMP), with the cyber and OT parts mapped to ISA/IEC 62443 and NIST SP 800-82.

You get

  • Gap assessment against SOCI obligations
  • CIRMP documentation
  • Prioritised remediation plan

We need from you

  • Asset register and existing risk documents
  • Access to people responsible for operations, IT and physical security

Typical duration 8–12 weeks, depending on the number of assets and how much documentation already exists.

Not sure which service fits?

Describe the plant and the problem in an email. See the contact page for what helps to include.